Pre Bid 12/23/2009
The main scope of the Siqueiros Mural project consists of constructing a steel and fabric shelter to protect the
existing 1932 mural painted by David Alfaro Siqueiros located on the upper portion of the exterior south wall of
the Italian Hall; a metal canopy and a 200 square foot steel viewing platform adjacent to an existing elevator
located on the exterior north wall of the Sepulveda House; and an approximately 6,700 square foot Interpretive
Center within the historic Sepulveda House as well as performing some hazardous material removal and lead &
asbestos removal work at the historic buildings.