The work, in general, consists of sawcutting and removing 2' of existing asphalt concrete shoulder; removing existing chain link and wood fences and gates; tree removal; constructing new curb and gutter and sidewalk; reconstructing existing driveway; placing 0.44' of Type A asphalt concrete over native soil; constructing new chain link and tongue and groove wood fencing; and doing other work appurtenant thereto.