Sealed bids from qualified contractors for the Sidewalk Project will be received by the Town for the redevelopment of a sidewalk. The work on the project includes demolition of an existing walkway, construction of concrete sidewalks, installation of additional drainage infrastructure including storm drains and culverts, associated driveway and roadway paving, crosswalk striping, and other incidental work. All construction activity is expected to be completed by October 1, 2012.