The City is accepting sealed bids from qualified construction contractors for the Sidewalk project. This project will construct a five-foot wide sidewalk on the north side of Road from the city limits at the County line to the subdivision, where there are currently sidewalks. The total length of the project is about 4/10 of a mile. The project will also create an improved crosswalk and pedestrian crossing at the intersection. This project will allow residents to have a sidewalk connection all the way to Elementary School.