Mandatory pre-bid meeting 01/19/2010.
Note: must register at site to access full RFP (registration is free).
The Infill project involves the construction of drainage, median islands and sidewalk improvements along several streets. Work shall include, but not be limited to: constructing, maintaining and removing temporary work zone traffic control and erosion control measures; performing all removal of structures and obstructions, clearing and grubbing, and earthwork operations; constructing drainage system including water quality facilities, sewer pipes and inlets; constructing segmental retaining walls; constructing concrete curb, driveways, median islands and sidewalks; and placing pavement markings and striping; installing signing; constructing roadside development including seeding, fencing, and mailboxes.