This document has expired, therefore the above link may no longer work.
The work will consist of constructing approximately 725 SF of concrete sidewalk, 2325 SF of integral curb and sidewalk, 94 LF of curb and gutter, 155 LF of detached curb, and any necessary grading and drainage work.