The work comprises, but is not limited to: mobilization; traffic control; removal of existing AC curb, pavement and sidewalk; construction of 6 inch PCC curb & gutter (to include cold milling and AC overlay paving); construction of 4 inch thick PCC sidewalk; construction of PCC ADA access ramps; installation of 2-rail galvanized steel railing; and signing and striping.