This document has expired, therefore the above link may no longer work.
Provide all materials, equipment, and labor for the construction approximately 550 LF of sidewalk (350 LF of concrete sidewalk, 200 LF of asphalt pavement sidewalk) in accordance with the specifications, conditions, and provisions