Major items include installation of approximately 2,219 SY of reinforced concrete sidewalk, removal and replacement of 5 driveways, 3 curb ramps, 132 LF of pedestrian handrail, reinforced concrete retaining wall, minor utility adjustments, 2,750 SY of furnishing and placing topsoil and block sodding.