The work to be done consists of the furnishing of all materials, labor and equipment for the complete construction of the CS 5079/Shannon Pkwy from SR 138 to CS 5082/mall Blvd Sidewalk Enhancements Project, including, but not limited to, erosion control, maintenance of traffic, grading, excavation, subgrade preparation, concrete sidewalks, signs, pavement marking, and grassing at location indicated in plan set.