The Town is seeking Design Service assistance from a qualified firm for the Project Design (Phase B) of the LTF Process. The firm that is selected will need to pick up the conceptual plans that have been completed to date and be responsible to add to the plans any of VTrans comments that are made from the in-house review. The Consultant will base the design largely on the concepts and preferred alternative sidewalk alignment as defined in the Sidewalk Project plans prepared by RSG, Inc.