The Project consists of furnishing all personnel, superintendence, skilled and unskilled labor, materials, equipment, services, and all work necessary for cleaning, videoing and relining approximately 16,000 feet of 8-inch to 12-inch diameter sanitary sewer piping using the Cured-In-Place Piping (CIPP) method; raising and installing water-proof frames and covers on associated manholes; rehabilitating approximately 700 vertical feet of 4-foot diameter manoles; replacing or relining associated service connections; constructing approximately 280 feet of 8-inch to 12-inch sanitary sewer; approximately 80 feet of 16-inch bore and jack steel casing; service lateral connections, cleanouts and associated appurtenances