The RFP Database
New business relationships start here

Service, Repair, preventative maintenance, and semi-annual test inspections for ACS, IDS, and Badging repair in Fallon, Nevada


Florida, United States
Government : Federal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The Government requires service, repair, preventative maintenance, and semi-annual test inspections of the Access Control System (ACS) which includes a badging system (computer/printer/camera), and the Intrusion Detection System (IDS) located at Naval Air Station (NAS) Fallon, Nevada. The current IDS security system requires semi-annual test inspections and the ACS workstation requires periodic patching and may require repair in the event of a system malfunction.

a.    The contractor shall comply with ICS 705-1 and IC Tech Spec version 1.4 for security
system maintenance and testing.
b. The contractor shall provide 24 hours a day, 365 days a year phone support able to
initiate repairs/establish priority within 4 hours of a trouble signal or a request for service.
c.
The contractor shall insure services conducted under this contract are performed by U.S.
citizens.

The maintenance for the NAS Fallon, Nevada shall include all components of the ACS to include the badging system (computer/printer/camera) and IDS.
a.    The contractor shall ensure service requests classified emergency are resolved within
24 hours.
b.    The contractor shall ensure service requests classified non-emergency are resolved
within 48 hours.
c.    The contractor shall test the system and backup batteries in accordance with the
manufacturerbs periodic maintenance schedule and procedures.
d.    The contractor shall replace batteries in accordance with the manufacturerbs
recommendations or as environmental conditions dictate.
e.    The contractor shall evaluate the ACS Operating System (OS) and CbCure 9000
software is current.
The contractor shall upgrade the ACS OS and CbCure 9000 software
to the latest versions as necessary.

Semi-Annual Inspection Requirements

a.    The contractor shall perform semi-annual inspections for the NAS Fallon, Building 406
(ADSGF) in accordance with IC Tech Spec ver.1.4 (28 Sep 2017) and include all
areas/components of the ACS and IDS.
b.    The contractor shall provide documentation of completed inspections within 30 days of
event completion (CDRL A001).
c.    The contractor shall ensure inspections are witnessed by ADSGF Government
Personnel

Michael Lothrop 4073808181 Jessica Roach, 407-380-8112

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP