The work to be done, in general, consist of furnishing all labor, materials, and equipment for work associated with the following: installing a new metal picket security fence around the existing police facility parking area and includes two (2) electrically operated vehicle gates and two (2) man/pedestrian gates, and other such items indicated and required by the plans, Standard Specifications, and the technical specifications.