The proposed work includes the following items and approximate quantities:
Mobilization-1 LS; #8 AWG Cu Type THW-200 LF; #8 AWG Cu Ground-100 LF;2" Sch. 80 PVC Conduit (Bored)-35 LF; 2" Sch. 80 PVC Conduit-65 LF;Replace Existing Gate Operator (Including Removal of Existing Equipment)-7 Ea;Ethernet Gate Switch 8-Ea; New Dual Gate Operator System-36 ft-1 Ea;Replace Loop Detector-10 Ea;1-1/4" PVC Conduit-9000 LF;1-1/4" PVC Conduit (Bored)- 3000 LF;Fiber Optic Wire-9000 LF;Trenching-6000 LF;Trunk Terminations-3 EA;Reader Terminations-23 Ea;ID Card System Software, Camera & Printer W/1000 Cards-1 LS; Central Equipment Room Infrastructure-1 LS; IP Gate Control & Security Keypad-8 Ea; IP Door Control & Security Keypad-9 Ea;Handhole Assembly Units-13 Ea;Building Access, Including Concrete Removal & Replacement-1 LS; Gate 7 Generator Power Source-1 LS; Unclassified Excavation-140 CY; Water-5 MGal;Subbase Course- 60 Tons;Recycled Base Course-75 CY;Geogrid-60 SY;Geotextile Separation Fabric-450 SY;18"CSP Culvert-36 LF;18" CSP Culvert End Sections-2 Ea;Seeding-2500 SF;8' Chain Link Fence with High Tensile Wire Top-255 LF;36 Ft. x 8 Ft. Double Slide, Chain-Link Gate with High Tensile Wire Top-1 LS;Existing Gate Post Replacement-6 Ea;TPZ Cameras-2 Ea;Network Video Recorder/Digital Video Recorder & Software-1 LS;FFC Interior Cameras Complete Install-9 Ea;46 Ft x 8 Ft Aluminum Gate Replacement-1 Ea;Hot Bituminous Pavement-100 Tons;PG 58-28 Asphalt Cement-7.5 Tons; Signs-40 Ea;Keyed Doors-2 Ea; Signs-42 Ea.