PLEASE NOTE: The Closing date has been extended to 06/26/2014. Amendment 1 has been issued.
The project consists of two security fence improvements.
The Trimmer Station requires the installation of a 1/2 hp solar powered entrance gate. The gate shall be 20' x 6' roll gate with safety loops, wireless keypad, solar panel, and will require a concrete pad.
At Douglas Station, the existing fencing shall be removed and replaced with 900' x 6' of chain-link fence. This location also requires two drive-through gates (one 17' and one 11') and two 3' wide man gates.
The Government Estimate is between $25,000 and $100,000.
Site visit information will be provided in the specifications.
Mary E Cantrell, Phone 559 297-0706 Ext. 4890, Fax 559 294-4833, Email [email protected] - Monica Gallegos, Procurement Tech, Phone 55929707064815, Fax 559-294-4833, Email [email protected]