Work to be done includes, but is not limited to, the removal of all existing process equipment in the East
Plant Primary Scum Well plus installation of two new pumps (owner provided), two mixing nozzles
(owner provided), flow indication equipment, level control equipment, and all associated valves, piping,
electrical, painting, etc.
Attendance at the pre-bid conference