Replacement of existing split system HVAC components (indoor and outdoor units and refrigerant line sets). Replacement of existing unit heaters in the locker rooms and kitchen. The addition of packaged outdoor rooftop units for the gymnasiums. A controls upgrade to DDC and integration of existing equipment (Alternate).