PHNSY and IMF require dry dock basin scaffold towers that meet all CFR requirements for scaffolds and work levels. These scaffolds will be used for repair/maintenance for navy vessels @ PHNSY and IMF. Equipment is needed to provide multi-level towers connected in a fashion that provides continuous, unobstructed walking/working surfaces to various areas for vessels in dry dock. Components need to be compatible to LAYHER brand scaffolds in all applications to enable incorporation into existing shop inventories. Material needs to be engineered to also meet anchor point requirements (i.e. Layher rosettes can be utilized as a tie off anchor point for fall protection). These towers need to meet size and work level requirements, 10 x 10 7 x 33 6 with work levels at 6 7 increments.
Towers need to be outfitted with pad eyes that have been engineered for crane lifts. Quantity TBD in solicitation but estimated at 39 total pieces.
To receive a direct copy of the solicitation anticipated late July, please fill out the attached market survey form and email to mark.bultman at navy.mil.
Tami Avery 808.471.2545 Technical POC: Claude Calabrese, claude.calabrese at navy.mil