The work shall consist principally of:
Installation of approximately 1,400 linear feet of CURED- IN-PLACE
PIPE into an existing 42" reinforced concrete sanitary sewer outfall pipe
as shown on the construction drawings. In addition about 140 linear feet
through 6 inch clay pipe, and about 775 linear feet thru 8 inch clay pipe
as alternates to the bid.