The work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment and incidentals and performing all work required to construct complete in place and ready to operate a sanitary sewer pump station and 6-foot diameter wet well with approximately 100 L.F. of 8-inch gravity sewer, 50 L.F. of 4-inch ductile iron pipe force main; erosion and sedimentation control measures; and appurtenances.