The work under this contract consists of removing existing brick cross walks; rebuild crosswalk base with PCC leaving 2 inch for surface asphalt; upgrade wheelchair ramps to the greatest extent practicable as directed by the engineer and repair/replace existing deteriorated brick gutters.