This project provides for the improvements for the replacement of Sunday Creek Bridge crossing the Sunday Creek in King County by clearing and grubbing, erosion control, removal of struc-tures and obstructions, roadway excavation including haul, temporary shoring and work access, sheet pile installation, prefabricated truss bridge construction, removal of existing bridge, con-struction of geosynthetic reinforced soil abutment wall, surfacing with crushed surfacing base and top course, approach slab, landscape area site preparation, and other work, in accordance with the following Special Provisions in conjunction with the 2008 Standard Specifications for Road, Bridge and Municipal Construction, issued by the Washington State Department of Transportation and the American Public Works Association, Washington State Chapter, and the 2007 King County Road Design and Construction Standards.