Pre-bid meeting on 3/31/2010 (not clear if mandatory). This work consists of the construction of traffic signs and sign structures, traffic signals and systems, barricades, providing and
installing multi-directional steel sign breakaway assemblies, modification of sign posts, furnishing and applying pavement marking, and furnishing, installing, and removing temporary pavement marking in accordance with these Specifications. See www.springsgov.com/rfp.aspx for documents.