Construction of 9x12 Pedestrian Tunnel under State Highway SR-248 at Comstock Dr. with wall, stairway, ramp, sidewalk and grading on north and south ends of tunnel to facilitate an ADA accessible pedestrian way. Project also includes sanitary sewer re-route, storm, irrigation, snowmelt system.