The Work includes the following major items: Generator replacement and installation of the new generators at 14 Wastewater Pump Stations. Work includes replacement of automatic transfer switches and electrical work at each facility. Salvage of existing generators and automatic transfer switches is by the Contractor. Some facilities require structural and concrete pads for equipment.