This project is for the removal of two existing corrugated steel culverts on Ryle Creek and replacing them with a structural-plate open bottom arch culvert on a concrete footing. The work includes but is not limited to clearing and grubbing, erosion control measures, structure excavation, roadway embankment, removing and disposing existing culverts, compaction, riprap, roadway surfacing, furnishing and installing precast concrete foundations, furnishing and erecting a structural-plate arch culvert, and all other incidental items necessary to complete the project in accordance with the plans and specifications.
Judy B Martin, Supervisory Contract Specialist, Phone 208-557-5841, Fax 208-557-5829, Email [email protected] - Amelia R. Velasco, Contracting Specialist, Phone (208) 557-5848, Fax (208) 557-5829, Email [email protected]