This Federal funded project will consist of grinding, overlay paving of the existing runway, grading and paving of the runway extension embankment, completion of pipe outlet, striping as required to provide for one-half width construction and final configuration of full width runway with existing 04 - 22 length and runway and taxiway edge lighting and power conduits and vaults for future FAA navigation aid displays.