NOTE: The project drawings and specifications call for a prefabricated steel superstructure design. Alternate materials (e.g., aluminum) will be considered in lieu of steel; contractor shall submit sufficient information about alternate materials with their proposal to confirm conformance with standard (FP-03) specifications for trail bridges.
All other terms and conditions remain unchanged; an SF30 will not be issued.
Jay Tobin, Contracting Officer, Phone 9708746625, Email [email protected]