Furnish all labor, materials, and equipment necessary to remove existing HVAC systems on the HQ Building and install the following as noted on the drawing and specified herein:
Four (4) 10 ton 13 EER and one (1) 15 ton 12 EER high efficiency RTU gas package units including curb adapters.