indham Technical High School was constructed in 1956. The total square footage of the facility is 172,979 square feet. Architect/engineer will survey existing building conditions, roof and mechanical systems; prepare alternate roof system analyses regarding conventional and "green" roof systems, prepare a design for the replacement roof and associated roof mounted mechanical systems at Windham Technical High School.