This document has expired, therefore the above link may no longer work.
This project generally consists of replacing existing EPDM membrane roofing, insulation and flashing in its entirety of Buildings 1, 2, 3, 4, 9, 10, 11 and 12. Provide new insulation, cover board and TPO membrane, including flashing.