Furnish all labor and materials to cut and prep the existing EPDM roof where damage has occurred. New ΒΌβ dens deck will be installed over the prepared area. The Firestone, or equal, 060 mil fully adhered EPDM will be installed over the dens deck and extend up and over the parapet wall. The metal cap will be removed and reinstalled. Tie in with the existing roof as required.