The RFP Database
New business relationships start here

Roof Repairs


Connecticut, United States
Government : Municipal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Note: pre-qualification with state DOT required.

Work consists of installation of a closed cell, sprayed-foam insulation coupled with a high-solids polyurea-urethane, hybrid coating system over the existing roof system.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP