Mandatory pre-bid conference 04/20/2010.
PROJECT DESCRIPTION (The Work consists of, but is not limited to): complete full depth street reconstruction including excavation, lime stabilization of subgrade, recycled base, HMAC, concrete curb, sidewalk and driveways. Utility work will include water and storm sewer line installation.