THIS PROJECT WILL REPLACE THE EXISTING CORRUGATED METAL PIPES WITH A DOUBLE CELL PRECAST CONCRETE BOX CULVERT. IT ALSO WILL RECONSTRUCT THE ROADWAY APPROACHES, PLACE GUARDRAIL AS REQUIRED, AND PLACE RIPRAP IN THE STREAM AS REQUIRED FOR SCOUR PROTECTION. TRAFFIC WILL BE DETOURED DURING CONSTRUCTION TO ACCELERATE THE PROJECT.