Services to be obtained: Project 69003 will be separated into (14) tasks. Each task or group of tasks will have a separate NTP. Task 1: Project management plan Task 2-5: Preliminary engineering, environmental activies, environmental site characterization and public involvement. Task 6-12: Preparation of the design study report, hydrologic and hydraulic design, geotechnical investigation, traffic and safety analysis, utility conflicts, Plans, Specifications & Estimate (PS&E), and completion documentation. Task 13-14: Assistance during bidding and assistance during construction.