The work under this Contract shall consist of: 1) 1 1/2 “ milling of existing mainline hot mix asphalt, perform longitudinal joint patching, and overlay with 2 ½ “ of warm mix asphalt, 2) full-depth milling of shoulders down to concrete, bituminous patching, and overlay with warm mix asphalt binder and surface courses to match the new surface on the mainline