The work under this Contract shall consist of: pavement patching on mainline/ramp pavement, hot mix asphalt removal and Stone Matrix Asphalt resurfacing, installation of 3 noise walls, drainage repair, roadway embankment stabilization, installation of permanent Intelligent Transportation System items (Close Circuit Television Cameras, Remote Traffic Monitoring Sensors and In-Pavement Vehicle Detection), guardrail removal and installation, signing removal and installation, and installation of permanent pavement markings and reflective pavement markers. The work also includes rehabilitation of 7 bridges.