Mandatory prebid conference on June 9, 2010. The project shall provide roadway lighting for a 3000 ft. (approximate) section of new roadway on the UWG campus. Included are 30 ft. aluminum poles with concrete bases, wiring in sch. 40 pvc conduit, a new 208 to 480volt transformer and lighting panel.