The proposed work consists of reconstructing SR 189 from MP 0.34 to MP 0.66 and overlaying with ACFC from MP 0.66 to MP 0.84. A new northbound acceleration lane will be added and a new southbound through lane will be added. The connection will be relocated approximately 1,100 ft north and will become signalized. A new signal will also be added.