Work includes: Sidewalk 4 inch 9,900 SF Drive Approach 6 inch 18,750 SF Curb and Gutter 4,800 LF Storm Drain Pipe 2,177 LF Sanitary Sewer Main 570 LF Street Reconstruction 8,500 SY