Optional pre-bid meeting 03/11/2010.
The work to be performed under this contract consists of, but is not limited to, provision of all skill, labor, material, and equipment necessary for the addition of a new northbound lane, including paving, curb & gutter, all required signage, storm drainage structures and piping, base installation, striping, traffic control signage, and other traffic control related items.