The Project consists of the widening and reconstruction of county roads. The proposed Project length is approximately 2.96 miles and includes two 11-foot travel lanes with right turn lanes where appropriate. The Project also includes 6-foot shoulders (typical) with varying cut/fill slopes and ditches where appropriate and consists of realignment of intersections.