he project includes the abandonment (in place) of 4,250 Liner Feet (LF) of existing 10-inch Asbestos Cement water line, the replacement (up to the property line) of 15 water services from the main (bored or jacked across the roadway) to the proposed meter location, the replacement (up to the property line) of 12 water services from the main (jacked or bored) to the proposed meter location, the installation of 55 LF of proposed 8-inch ductile iron water line, the installation of 235 LF of proposed 12-inch ductile iron water line, the installation of 3,900 LF of proposed 16-inch ductile iron water line, the installation of 5 fire hydrant assemblies, the tie-in of the proposed water lines to the existing water lines along and all associated work.