Install field inlets, junction boxes, approximately 400 feet of reinforced concrete pipe, pavement and culvert; fencing; grading; sodding; erosion and sediment control, and all labor, materials, equipment, tools, and any and all services necessary to perform the work. Work takes place in public right of way as well as on private property near existing residences.