This Federal funded project will consist of grading, paving, drainage and armor improvements to 4.6 miles of road. The urban improvements consist of: excavating the existing base, adding subbase, base and 2-1/2 inches of asphalt pavement to the existing roadway. Drainage improvements include: ditching, driveway culverts and cross pipes.