The RFP Database
New business relationships start here

Road Reconstruction Drilling Services


Alaska, United States
Government : State
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The drilling is in support of gathering design data. The drilling work requires a truck and a track- mounted drill rig(s) capable of drilling holes to at least 50ft using hollow stem auger (HAS) or 150 ft using casing and tri-cone drilling methods. A rubber-track mounted drill rig is also acceptable for on-road work (in place of a truck mounted drill rig). The work also requires the Drilling Contractor (Prime) to provide a Traffic Control subcontractor for lane closures on Highway.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP