The Work will consist of all labor, equipment, and material to reconstruct approximately 1.25 miles with new pavement, curb and gutter, sidewalks, and ADA ramps at intersections; construction of two (2) concrete box culverts, new storm water crossings, parallel storm drains, drainage channels, and retention ponds; and relocation of underground water and sewer lines at various locations.