The work includes widening and resurfacing the existing two lane pavement to a three lane 36 foot wide asphalt pavement; installation of new 6” to 36” storm sewer, catch basins, and manholes; construction of sidewalks; minor waterline and sanitary sewer improvements; pavement marking and RPM installation; and other related work. The length of work is 0.69 mile. The estimated construction cost is $1,664,769.30. The successful contractor shall be prequalified by the Ohio Department of Transportation to perform the work specified.